THE PUBLICATION GATE

Prepared for review.
Published by approval.

The 5P publication diagnostic structures the information a reviewer needs. It does not certify the project or recommend it as an investment.

5P / People

People

  • A named accountable sponsor and project team are identified.
  • The landowner or authorized representative is identified.
  • Required technical and commercial capability is mapped.
  • Partner roles and contributions are documented.
  • Conflicts and ownership responsibilities are disclosed.

5P / Process

Process

  • A clear development and delivery sequence exists.
  • The local permitting route and current status are documented.
  • Procurement and reporting responsibilities are defined.
  • Key risks have owners and proposed actions.
  • Evidence can be traced to a source and date.

5P / Product

Product

  • The proposed solution fits an eligible group industry.
  • The customer or occupier need is described.
  • Selected systems and specifications are documented.
  • The brand or licence requirement is identified.
  • Technical and environmental claims have supporting evidence.

5P / Project

Project

  • The site and land-control position are described.
  • The location and applicable market are defined.
  • A credible schedule and development milestones exist.
  • Permitting dependencies and local delivery needs are identified.
  • The project has a defined scope and configuration.

5P / Profit

Profit

  • The total project value and calculation basis are documented.
  • Capital required and partner contributions are identified.
  • Revenue or commercial demand assumptions are explained.
  • Sensitivity, contingency and material commercial risks are considered.
  • Proposed fees, deposit and investment assumptions are understood.

Four mandatory gates.

The submitter is authorized to present this project.

Land ownership, option or access rights are documented, or the dependency is explicitly disclosed.

The stated total project value has a documented basis and material assumptions are disclosed.

Permitting status, risks and proposed use of the brand are accurately disclosed.

01People
02Process
03Product
04Project
05Profit

The diagnostic is a structured, rules-based readiness assessment. Submitted answers and documents still require independent review; they are not AI-verified facts.